Paving
We saw cut full depth, price per linear foot. Then we remove the current paved area, priced per square foot. The area is excavated with machinery. Concrete, asphalt and/or dirt is hauled off-site. *The subgrade is compacted using recycled concrete as needed. The concrete is then formed and poured to the size, shape, and depth of the owner’s specifications. Paving has a broom finish and is priced per square foot.
*New paving sub grade is compacted using existing native soil as needed. The general contractor is responsible for sub grade elevation & compaction +\-1”.



Parking Lots
We remove the existing parking lot and price per square footage. Excavate the area with machinery. Concrete, asphalt and/or dirt is hauled off-site. The sub-grade is compacted using recycled concrete as needed. The concrete is then formed and poured to the size, shape, and depth of the owner’s specifications. Parking lots have a broom finish and are priced per square foot. Finally, we saw cut the control joints.
We like to give different depth options for parking lots, generally 6” and 8” thick.
Interior Floors
We set forms per the plan and details. Pricing is based on square footage. Insulation and vapor barrier are set per plan. The concrete is then supported by rebar or wire per plan. Concrete is then poured after other contractors have set plumbing and electrical.
The general contractor is responsible for sub grade elevation & compaction +\- 1″.




Retaining Walls
Retaining walls are a different kind of project altogether than concrete flat work. We have different options for walls.
Concrete
Price is figured by linear feet after height and thickness are established. The wall is installed per plan details. We excavate, form and pour the concrete per plans. The area will be back-filled and compacted. Excess soil will be hauled off-site and priced per approximate cubic yards.
Segmented Block

Price is figured per square foot. We ask our customers to select block from Watkins Concrete Block Vertica Pro or Diamond Pro Retaining Wall System. The existing wall will be removed by machine and hauled off-site. A recycled concrete base will be placed and compacted. After the base course has been set; a drain pipe will be installed. A geo-grid is installed to help stabilize the wall, when needed. The wall is back-filled with drainage composite material. After the wall is built a cap block (usually 4”) is installed. Finally, the soil is graded in the immediate area of the wall for proper drainage.
Stamped Concrete
Price is based on square footage. The area is excavated by machine and the existing concrete/dirt is hauled off-site. A recycled concrete base will be used to stabilize the sub-grade as needed. Concrete is formed and poured with the base color to the size and shape of the plan details or owner’s specifications. Then the stamp, with the pattern selected by the owner, and antiquing color release are applied. The following day we saw cut control joints.

Pavers
The area is excavated by machine and the existing concrete/dirt is hauled off-site. We install and compact a crushed rock base for proper drainage. The area is formed to the size and shape of the plan details or owner’s specifications. The joints are filled and compacted.